【SMM Steel】U.S. Steel restarted Blast Furnace B at Granite City Works to meet rising demand. The facility returned to active production after a restart process that began in Dec 2025. About 400 new employees were hired to support operations. The company emphasized safety and collaboration with the United Steelworkers. The restart aligns output with current market requirements.
Apr 1, 2026 16:22[SMM Lead Market Flash] This week, a small-scale smelter in Yunnan underwent maintenance and suspended production due to issues including raw material supply. As for its production resumption plan for April, it has not yet been determined.
Mar 30, 2026 18:02The European Union has officially approved a €390 million bridge loan to support the operational turnaround and environmental compliance of Italy's Acciaierie d'Italia (ADI), formerly known as Ilva. The massive Taranto steelworks is currently running at a critically low annual production capacity of 1.5 to 1.8 million metric tons, relying solely on Blast Furnace No. 4 while Blast Furnaces No. 1 and No. 2 remain idled for extraordinary maintenance. The newly secured state-backed funding is aimed at restarting these idled furnaces, restoring essential coke oven gas treatments, and stabilizing the employment of thousands of workers currently under an extended extraordinary layoff scheme
Mar 26, 2026 13:28ArcelorMittal Poland has invested approximately PLN 60 million ($16.08 million) to modernize Blast Furnace No. 3 at its Dąbrowa Górnicza plant, preparing it for a potential restart as early as spring 2026. The furnace has been idle since September 2025 due to weak demand, and the current refurbishment focuses on rebuilding the hearth with new ceramic materials to extend its operational life by four years. This move signals the company's readiness to react to potential recovery in European steel demand despite ongoing regional economic headwinds.
Mar 23, 2026 13:25According to data from China Customs: Combined for January–February 2026, China imported 265,100 metric tons of high-carbon ferrochrome in total, a year-on-year decline of 51.6%. Breakdown by origin: imports from South Africa were 40,700 metric tons, down 83.3% year-on-year; imports from Kazakhstan were 158,400 metric tons, down 19.7% year-on-year.
Mar 23, 2026 10:27[Garpenberg Zinc Concentrates Production Was Suspended Due to Seismic Activity] According to Boliden, production at the Garpenberg mine was temporarily suspended on March 14 due to seismic activity, and the beneficiation plant subsequently also halted production. Seismic activity has since eased, and preliminary inspections of the mine began on March 18. Mine production will gradually resume after inspections of the infrastructure and mining workplaces are completed. It is not yet possible to determine the timing of the production restart or the pace of ramp-up. In 2025, Garpenberg's zinc concentrate production was 101,700 mt in metal content.
Mar 20, 2026 18:01[Sinomine Resource Group Engages with the Zimbabwean Government to Restart Its Lithium Export Business] Sinomine Resource Group confirmed that, after this African country recently suspended shipments of lithium concentrates, the company had been actively engaging with Zimbabwean government authorities to restart its lithium export business. The Chinese miner disclosed this development on Friday in response to an investor inquiry via the Shenzhen Stock Exchange’s official interactive platform. These talks came at a critical time for both Sinomine Resource Group and Zimbabwe. Lithium remained a sought-after mineral because of its essential role in producing batteries used in EVs and renewable energy storage systems. Zimbabwe, which holds substantial lithium reserves, had continued tightening its regulatory framework to ensure more value addition remained in China, rather than allowing the export of raw ore or materials that had undergone only preliminary processing. Sinomine Resource Group said in a statement that it was currently working closely with Zimbabwean government authorities on a new export approval application. The company stressed that the dialogue remained ongoing and formed part of its broader efforts to align with the country’s latest policies and compliance requirements. Although there was no clear timetable yet for when exports would resume, the engagement sent a positive signal that efforts were being made to resolve the issue. Source: https://www.chemanalyst.com/ [Vulcan Energy Achieves Drilling and Permitting Milestones at Its Geothermal Lithium Project in Germany] The company had officially broken ground at the Trappelberg drilling site in the Rohrbach area near Landau. This was Vulcan’s second drilling site after Schleidberg, where the company had completed the drilling and testing of its first geothermal well. Preparatory work at Trappelberg had begun to support the start of drilling in H2 2026. At present, a deep groundwater monitoring well had been completed to ensure the protection of near-surface aquifers during construction and drilling operations. Schleidberg and Trappelberg were 2 of the 5 new drilling sites that Vulcan would develop in the region. Thorsten Weimann, Chief Development Officer and Managing Director of Vulcan Energie Ressourcen GmbH, said: “The groundbreaking ceremony at Trappelberg marks an important step forward in the further development of our Lionheart project. With this new drilling site, we are further developing the geothermal reservoir and laying the foundation for climate-neutral heating in the region and sustainable lithium production in Europe.” Source: https://www.thinkgeoenergy.com/ [Core Lithium’s Finniss Project Secures a Strategic Financing Package of AUD 290 million] The fundamentals of global battery demand were reshaping investment strategies in the critical minerals sector, placing Australia’s lithium industry at a critical turning point. The combined effects of supply chain diversification needs, advances in energy storage technology, and geopolitical factors have created an environment in which strategic positioning determines the long-term value creation potential of mining. In addition, the restart of Core Lithium's Finniss project, backed by A$290 million, demonstrates how well-developed critical minerals strategies can unlock previously stalled projects through innovative financing structures. Against this backdrop, complex financing structures and operational optimization approaches have become key differentiators for projects seeking to capture the evolving market dynamics of the current lithium investment cycle. The sophisticated financing structure underpinning the restart of Core Lithium's Finniss project shows that contemporary mining finance has evolved beyond traditional debt-and-equity models into a strategic consortium model that disperses risk while maximizing operational synergies. Moreover, this financing approach reflects a broader trend across the mining sector. Source: https://discoveryalert.com.au/ [Copper, Cobalt, and Lithium Mines: US Critical Minerals Growth] In early 2026, Secretary of State Marco Rubio, together with senior US officials including Vice President JD Vance and Treasury Secretary Scott Bessent, received representatives from 54 countries and the European Commission at the Critical Minerals Ministerial meeting. The US announced new bilateral frameworks, financing initiatives exceeding $30 billion, and launched the Forum for Resource and Geostrategic Engagement (FORGE), aimed at building secure, diversified, and resilient critical minerals supply chains. Initiatives such as the Orion-Glencore memorandum of understanding and "Project Vault" indicate the US government's commitment to incentivizing private-sector investment and ensuring a stable and reliable supply of cobalt, copper, and other strategic materials, including those from the DRC. Source: https://miningdigital.com/ [Atlantic Lithium's Ewoyaa Project Financing Secures a Strategic Investment of $16.4 million] The global critical minerals landscape is undergoing a fundamental transformation, and institutional capital allocation strategies have moved beyond traditional mining investment models. Pension funds, sovereign wealth funds, and strategic investors now require more sophisticated financing structures to align long-term capital commitments with project de-risking milestones. This shift indicates the growing maturity of financing in the resources sector, which is moving away from speculative early-stage funding toward a more infrastructure-like investment approach that places greater emphasis on predictable returns rather than commodity price speculation. Contemporary lithium project development reflects this evolution, with financing solutions from diversified funding sources incorporating conditional capital structures, local ownership requirements, and ESG compliance frameworks. The combination of milestone-based warrant instruments, strategic partnership agreements, and domestic exchange listings has created an integrated financing ecosystem that balances capital efficiency with political and economic considerations. In addition, these innovations in the lithium industry are continuing to reshape the investment landscape. Source: https://discoveryalert.com.au/
Mar 20, 2026 09:37Refined Cobalt: This week, spot refined cobalt prices generally fluctuated around 430,000 yuan/mt. During the week, prices briefly surged on news of procurement by overseas traders and export controls in the DRC, but later pulled back into the fluctuation range as macro sentiment weakened and downstream procurement follow-through proved insufficient. In terms of supply, ex-factory prices at mainstream smelters remained stable, traders' spot-futures price spread quotations were steady, and there were no significant changes in the structure of cargoes circulating in the market. In terms of demand, affected by weak cost pass-through, downstream enterprises still showed low acceptance of high-priced raw materials and only maintained a pace of just-in-time stockpiling, with no significant increase seen in actual transactions. Fundamentally, the DRC's export control policy further increased uncertainty over cobalt intermediate products exports, while the pattern of structural tightness in China's raw material supply remained unchanged, continuing to provide bottom support for cobalt prices. Cobalt Intermediate Products: This week, cobalt intermediate product prices continued to hold steady, and the market remained in a pattern of "prices quoted but no trading." In terms of supply, the impact of the DRC's export control policy continued to unfold, market concerns over whether miners could ship smoothly intensified, suppliers' bullish expectations heated up, and they continued to withhold quotations, leaving extremely scarce spot cargoes available in the market. In terms of demand, although smelters still had willingness to procure raw materials, constrained by cobalt salt prices that struggled to catch up, and with downstream orders yet to become clear, enterprises maintained a cautious wait-and-see stance, and actual transactions remained sluggish. Overall, ongoing disruptions in the DRC's export process continued to cast doubt on the timing of bulk arrivals at port, and the structurally tight raw material situation in China may further intensify. Once downstream orders are gradually finalized and procurement demand restarts, intermediate product prices are still expected to have upward momentum. Close attention should be paid to the progress of DRC exports and the pace of downstream demand recovery. Cobalt Sulphate: This week, spot cobalt sulphate prices continued to remain stable. In terms of supply, supported by tight raw materials, most smelters held firm on quotations in the range of 95,000-98,000 yuan/mt. During the week, the DRC's export control document strengthened traders' expectations for a rise in future cobalt salt prices, and low-priced shipments in the market decreased significantly. In terms of demand, most enterprises remained concerned about future orders, and with their own raw material inventory relatively sufficient, they prioritized inventory consumption and only maintained sporadic just-in-time procurement, mainly at low prices. Overall, the market remained in the inventory digestion stage in the short term, with continued bargaining between sellers and buyers, and prices were mainly driven by rangebound adjustments. However, the DRC raw material supply issue has yet to be resolved, and cost support still exists. Once downstream inventories are depleted and procurement restarts, cobalt sulphate prices are expected to regain upward momentum.
Mar 19, 2026 17:39[SMM Tungsten Express] Almonty Industries has completed Phase 1 commissioning at South Korea's Sangdong tungsten mine, restarting production after a 30-year hiatus. The mine processes ~640,000 tpa ore, producing ~2,300 tpa tungsten concentrate. Phase 2 expansion targeted for 2027 will double throughput to 1.2Mtpa and output to ~4,600 tpa, representing ~40% of ex-China global tungsten supply. Project investment exceeds US$100 million with 45+ year mine life.
Mar 19, 2026 10:07Recently, two hydrogen-powered excavators, two hydrogen-powered loaders, and four hydrogen-powered wide-body mining trucks were officially put into operation in the Jinshan mining area, marking the implementation of the integrated “production, storage, refueling, transportation, and use” layout of Daye’s hydrogen energy industry in the application segment. This achieved the large-scale use of hydrogen-powered heavy engineering equipment in mining areas across China and injected new momentum into the green, low-carbon transformation of mines. As core equipment developed by Taiyuan Heavy Machinery, the TZ350EH hydrogen-powered excavator and TZ958EH hydrogen-powered loader worked in coordination with hydrogen-powered wide-body mining trucks, covering the entire process of mining, loading, and transportation. The equipment emitted only pure water, thoroughly improving the operating environment of traditional mining areas. This batch of hydrogen-powered equipment was deeply optimized for the complex working conditions of mines, with prominent core advantages: the hydrogen-powered excavator featured zero emissions and low noise, and could operate at full load after just five minutes of hydrogen refueling; the hydrogen-powered loader integrated hydrogen power with heavy-load performance and, equipped with proprietary technology, reduced consumption and improved efficiency; the hydrogen-powered wide-body mining truck offered fast energy replenishment, a high energy recovery rate, and excellent low-temperature starting performance, laying a solid foundation for green transportation. This large-scale deployment enabled hydrogen-powered equipment to undergo practical verification in real mining scenarios. It not only opened up a new path for the clean replacement of mining equipment, but also stabilized market demand for upstream hydrogen production, storage, and transportation, promoted coordinated development across the upstream and downstream segments of the hydrogen energy industry chain, and provided a replicable and scalable practical model for transforming traditional mining areas into green and intelligent mines.
Mar 18, 2026 13:51