As of March 24, titanium dioxide prices continued to rise, with the SMM index up 4.6% since early 2026. Two rounds of price hikes were issued in March amid low inventories. Strong exports and production cuts supported gains, though sustainability post-peak season remains uncertain, hinging on downstream acceptance.
Mar 24, 2026 14:35Strait of Hormuz disruptions and Iran tensions are driving up aluminum prices and premiums. Aluminium Bahrain and Qatalum have cut output, while feedstock is tight. Rerouting via Port of Sohar or Saudi ports raises costs and delays. Buyers are turning to China, India, Russia, Canada, and scrap to offset risk. Prolonged disruption could reduce Middle East market share and reprice it as higher-risk supply.
Mar 24, 2026 17:22Jan-Feb 2026 China magnesium exports reached 72.7kt, up 3.4kt YoY. Magnesium alloy led with +33.1% YoY, orders booked through April. Magnesium ingot fell 6.8% due to weak European demand, while powder grew 10.3%. However, US-Israel conflict disrupted Middle East aluminum plants, halting regional magnesium orders and pressuring Q2 outlook despite the strong start.
Mar 23, 2026 17:59As supply and demand for construction steel were not fully matched across different markets, regional supply-demand mismatches created price differentiation, which in turn drove the cross-regional circulation of steel resources. When the regional price spread gradient was appropriate, regions with surplus construction steel capacity and production often shipped excess resources out, thereby rebalancing construction steel resources across regions.
Mar 24, 2026 15:54On March 20, the Information Office of the Inner Mongolia Autonomous Region Government held a press conference in the series “Implementing the ‘1571’ Work Deployment and Promoting High-Quality Development in Inner Mongolia,” providing a special briefing on the region’s achievements in green hydrogen industry development, key tasks for 2026, and the 15th Five-Year Plan. It made clear that, by leveraging its advantages in wind and solar power resources, Inner Mongolia will advance the full-chain layout of green hydrogen and continue to lead the nation’s green hydrogen industry. Key Focuses of the Hydrogen Energy Industry in 2026: Building a Pioneer Zone for Green Hydrogen Development In 2026, with the construction of a national pioneer zone for the green hydrogen industry as its core goal, Inner Mongolia will comprehensively advance the large-scale deployment of green hydrogen. It will launch pilot projects for large-scale off-grid hydrogen production, expand application scenarios such as blending green hydrogen into natural gas and coupling with the chemical and metallurgical industries, while simultaneously building green hydrogen industrial parks and broadening channels for the non-power use of green electricity. Within the year, construction will begin on three green hydrogen pipelines, including the Ulanqab–Beijing-Tianjin-Hebei route, to improve the transmission network. At the same time, the region will focus on breakthroughs in hydrogen energy technology, deepen collaboration among industry, academia, research, and application, and advance the implementation of demonstration projects for the first unit (set) of hydrogen energy equipment and collaborative innovation projects integrating wind and solar power, hydrogen, and energy storage, so as to consolidate the industry’s technological foundation. Green Hydrogen Industry Achievements Lead the Nation, with Advantages in Both Scale and Cost Becoming Prominent Inner Mongolia is richly endowed with wind and solar power resources, with technically developable wind and solar power resources exceeding 10 billion kW, accounting for one-quarter of the national total, laying a solid foundation for the green hydrogen industry. At present, multiple industry indicators ranked among the top nationwide. A total of 19 policies covering the entire industry chain of green hydrogen had been introduced; 7 projects were included in national demonstration programs; 8 projects were completed and put into operation, forming annual capacity of 80,000 mt. Green hydrogen production reached 12,694 mt in 2025, surging 3.6 times YoY; production in January and February 2026 was 2,653.6 mt, with production costs at 17-20 yuan/kg, only 60% of the national average. In addition, the country’s first provincial-level green hydrogen pipeline plan had been implemented, and the pipeline network featuring “one trunk line, two loops, and four outlets” was being accelerated. The hydrogen pipeline from Darhan Muminggan Banner to urban Baotou had already been completed, while green hydrogen applications now covered transportation, chemicals, power, and other fields, with the consumer market maturing rapidly. Precise Planning Under the 15th Five-Year Plan to Build a Strong Hydrogen Energy Industry Cluster During the 15th Five-Year Plan period, based on its existing foundation, Inner Mongolia will build a distinctive hydrogen energy industry cluster and focus on advancing four major tasks: scientifically formulate industry plans and reasonably lay out clusters by producing based on sales; tackle core technologies such as off-grid hydrogen production and flexible electrolyzers to raise the industry’s technological level; expand diversified application scenarios, improve business models, and open up the entire chain of production, storage, transportation, refueling, and utilization; accelerate the construction of green hydrogen pipelines within the region and across provinces, reduce transportation costs, comprehensively enhance the competitiveness of the green hydrogen industry, and support the industry in continuing to lead the nation.
Mar 24, 2026 13:45SMM, March 23: According to market sources, Nandan County Jilang Indium Co., Ltd. is expected to offer crude indium ingots for external sale on the 23rd of this month, with indium purity ≥99.00%, approximately 1,000 kg, subject to YS/T 1163-2016 Crude Indium. Delivery location: the warehouse of Nandan County Jilang Indium Co., Ltd. (Industrial Park, Chehe Town, Nandan County, Hechi City). The seller is responsible for loading and weighbridge measurement, and the freight shall be borne by the buyer. The bidding deadline is before 16:00 on March 23, 2026, after which it will be invalid.
Mar 23, 2026 09:43SMM News: As of March 20, 2026, the market price for Praseodymium-Neodymium (Pr-Nd) metal in China stabilized temporarily at 890,000–910,000 RMB/ton. This article utilizes the SMM Pr-Nd Terminal Demand Calculation Model to dissect the demand logic for 2026 across three core sectors—New Energy Vehicles (NEVs), Internal Combustion Engine (ICE) vehicles, and Wind Power—explaining the current supply-demand dilemma facing the NdFeB magnet and broader Pr-Nd markets.
Mar 23, 2026 08:45Combined for January and February 2026, China’s cumulative chrome ore imports reached 4.0144 million tons, up 13.2% year-on-year. Breakdown by origin: imports from South Africa were 3.2422 million tons (up 6.2% year-on-year), imports from Turkey were 184,700 tons (up 55.8% year-on-year), and imports from Zimbabwe were 400,000 tons (up 70.3% year-on-year).
Mar 23, 2026 14:15[SMM Chrome Daily Review: Price Gains Slowed, and the Chrome Market Operated Steadily] March 23, 2026 News: Quotations for chrome ore and ferrochrome remained unchanged for the time being...
Mar 23, 2026 15:27[Magnesium Prices Stuck in Dilemma: Geopolitical Tensions, Cost Support, and Demand Surge Clash with High Supply] Reviewing the recent magnesium market, magnesium prices repeatedly fluctuated within the 16,600-16,700 range, with a relatively slow pace.
Mar 20, 2026 15:56