[SMM Aluminum Express News] Norsk Hydro said its majority-owned Slovak joint venture, Slovalco, has secured an agreement with the Slovak government to partially restart primary aluminium production in Q4 2026 following a four-year shutdown. The restart will initially bring back 75,000 tpy of smelting capacity, supported by a new long-term power supply agreement and compensation for indirect carbon costs under the EU Emissions Trading System. Slovalco plans to invest €100 million to resume operations, while the restart of the remaining 100,000 tpy of capacity will depend on market conditions and additional power contracts beyond 2030.
Jul 1, 2026 18:29[SMM Silicon-based PV Morning Meeting Summary] Silicon metal: Yesterday, SMM oxygen-blown #553 silicon in east China was at 9,000-9,200 yuan/mt, and #441 silicon was at 9,200-9,400 yuan/mt. On the futures market, the most-traded contract consolidated at 8,400 yuan/mt. With strong support below prices, there is limited downside room, while upside bullish drivers are insufficient. The silicon metal market was stagnant and consolidating at lows. Wafers: In the wafer market, 18X wafer prices are at 0.85-0.88 yuan/piece, 210RN wafers at 0.96-0.98 yuan/piece, and 210N wafers at 1.16-1.18 yuan/piece. Wafer prices have temporarily stopped falling and stabilized.
Jul 1, 2026 09:05
In June 2026, SMM secondary refined lead production rose slightly by 2.23% MoM, but dropped sharply by 31.2% from the 2026 peak of 282,000 mt in January. The industry’s production center shifted lower continuously in Q2. SMM’s weekly operating rate for secondary lead across four provinces hovered in the range of 28.4%–29.7% throughout the month, staying well below the normal reasonable range for a prolonged period.
Jun 30, 2026 22:21Savannah Resources announced on June 29 that its Barroso lithium project in Portugal – Europe's largest petalite deposit – would resume operations effective immediately. The restart followed a decision by the Portuguese government to reject an anticipated precautionary measure, thereby lifting the suspension of the related temporary land easement order and removing the final hurdles to site access in the pre‑construction phase. In its ruling, the Portuguese government stressed that the project is of major national and European significance, supporting EU strategic autonomy and the energy transition. It will effectively boost the inland economy, strengthen regional cohesion through job creation, and acknowledged Savannah's compliance during the initial easement implementation in 2025, as well as its active engagement with community concerns. The company said the timely resumption was in line with expectations, and that it would proceed with on‑site work and the final feasibility study.
Jun 30, 2026 19:22[Lead Smelter Updates] It is learned that a medium-sized primary lead smelter in north-east China is about to complete its routine maintenance and plans to restart and resume production tomorrow (June 25). Lead ingot output is expected in early July, and after the plant resumes operations, daily production is expected to be around 200 mt.
Jun 24, 2026 14:25![[SMM Analysis] NPI Market: Supply Crunch Fuels H1 Price Surge, Tight Balance to Persist Through 2030](https://imgqn.smm.cn/usercenter/qLeLR20251217171733.jpg)
In H1 2026, the Indonesian 10-12% high-grade NPI (delivered to port, tax inclusive) market trended steadily upward, with the SMM average price rising 12% compared to the same period in 2025. Price movements were characterized by “stepwise increases and fluctuations at highs.” Each round of supply-demand imbalance and policy disruption pushed prices onto a higher level.
Jun 18, 2026 09:01CMOC's Tenke Fungurume Mining (TFM) copper-cobalt operation in the Democratic Republic of Congo has offered a bonus package to workers in an effort to end an ongoing strike, according to local union representatives. The company reportedly proposed a one-off bonus and related compensation measures while urging employees to resume operations. TFM is one of the world's major copper-cobalt mining operations. Closely monitoring the outcome of labor negotiations, as a prolonged strike could affect mine operations and regional copper-cobalt supply.
Jun 8, 2026 09:57Rio Tinto plans to restart the idle Line 4 potline at the New Zealand Aluminum Smelter (NZAS) in Tiwai Point and has signed a letter of intent with Contact Energy for a power purchase agreement. If finalized, the potline could resume operations in 2030. The line has been idle since 2020 and is expected to add about 30,000 tones of aluminum production annually once fully operational. Rio Tinto said the restart could contribute around NZD 100 million (about USD 59 million) annually to the local economy while strengthening New Zealand’s aluminum industry and energy cooperation.
May 28, 2026 09:48Mineral Resources Limited (MinRes) announced the restart of its wholly-owned Bald Hill lithium mine, citing sustained recovery in lithium prices. The mine was placed on care and maintenance in Nov 2024 to preserve 58.1Mt at 0.94% Li₂O.Located in Western Australia's Goldfields, Bald Hill has capacity of ~165,000 dmtpa of 5.1% spodumene concentrate (140,000 dmt SC6). Using existing inventory, equipment and workforce networks, MinRes can resume operations safely and quickly.Site activities ramp up in late May, crushing and mining start in June, first concentrate in July. First shipment from Port of Esperance expected Q1 FY27, full capacity Q2 FY27. Restart costs (incl. working capital) estimated at A$20m, incurred in Q4 FY26. FY27 guidance to be provided in August.
May 18, 2026 17:27During the survey period (May 5-11), the operating rate and capacity utilization rate of rebar and wire rod in the Central China region both increased.
May 12, 2026 11:09