Jinchengxin announced on the evening of May 22 that the company held the 22nd meeting of the 5th Board of Directors on May 8, 2025 and the 2nd Extraordinary General Meeting of Shareholders of 2025 on May 26, 2025, at which the "Proposal on the Planned Investment and Construction of the Alacran Copper-Gold-Silver Mine Project" was reviewed and approved. The company agreed to invest approximately $231 million in the construction of the Alacran copper-gold-silver mine project based on the expected shareholding ratio (55%). Currently, the company's equity interest in the Alacran copper-gold-silver mine has increased to 97.5%, and accordingly the company plans to increase project construction investment by $178.67 million in line with the change in equity ratio, bringing the cumulative investment to approximately $409.89 million. Apart from the aforementioned changes in the company's contribution ratio and corresponding investment amount, the investment estimate, construction plan, and other aspects of the Alacran copper-gold-silver mine project remain unchanged, still based on the feasibility study (FS) of the Alacran copper-gold-silver deposit completed in December 2023 (adopting the NI 43-101 standard). Regarding (1) Project Overview, Jinchengxin announced: Investment project: Alacran copper-gold-silver mine open-pit mining and beneficiation project. Based on the feasibility study (FS) of the Alacran copper-gold-silver deposit completed in December 2023 (adopting the NI 43-101 standard), the main content of the project design is as follows: Design scale: This project is a mining and beneficiation project. The mine adopts open-pit mining, with total ore within the designed pit limit of 97.9 million mt. The mine produces surface oxide ore and previously mined and stockpiled tailings (old tailings), as well as mixed ore and primary ore. For different ore properties, a grinding-flotation plant and a gravity separation plant are designed. The grinding-flotation plant mainly processes primary ore and mixed ore, while the gravity separation plant processes surface oxide ore and old tailings. The grinding-flotation plant has a designed processing capacity of 17,600 mt/day, with final products being copper concentrates and gold-silver concentrates; the gravity separation plant has a designed processing capacity of 2,400 mt/day, with final products being gold-silver concentrates. The project is expected to cumulatively recover 797 million pounds of copper, 550,000 ounces of gold, and 5.35 million ounces of silver. Investment estimate: The project investment estimate is $420.4 million, to be used for open-pit mine infrastructure stripping, mining industrial site, raw ore primary crushing station, coarse ore stockpile, grinding-flotation plant and gravity separation plant, concentrates thickening and filtration system, tailings thickening and conveying system, tailings storage facility, mine roads, water supply system, main step-down substation, external power supply lines, external roads, office and living camp, sewage treatment facilities, etc. Company investment amount: The company plans to invest approximately $409.89 million based on a 97.5% shareholding ratio, an increase of $178.67 million over the previously approved amount. Construction plan and service life: The project construction period is 2 years, and the mine life after completion is expected to be 14.2 years. Economic benefit forecast: The project's after-tax net present value (NPV) is $360 million (discount rate 8%), internal rate of return (IRR) is 23.8%, and the investment payback period is expected to be 3 years. The economic benefit calculation is based on copper prices of $3.99/pound, gold prices of $1,715/ounce, and silver prices of $22.19/ounce. For details on the feasibility study (FS) of the Alacran copper-gold-silver deposit, please refer to the "Jinchengxin Progress Announcement on the San Matias Copper-Gold-Silver Project" released by the company on December 19, 2023. Regarding the impact of this investment on the publicly listed firm, Jinchengxin stated: (1) After the project is put into production, it is expected to have a certain impact on the company's future business development and operating performance, which is conducive to the company's further expansion into the mine resource development field, improving the company's industrial layout, and promoting the company's sustained, stable, and healthy development. (2) This investment in the subsequent construction of the Alacran copper-gold-silver mine project based on the shareholding ratio is in line with the company's long-term development plan, is conducive to promoting the company's sustained, stable, and healthy development, and does not harm the interests of the company and shareholders, especially minority shareholders. Jinchengxin announced on the evening of May 17 that the Environmental Impact Assessment (EIA) for the company's Alacran copper-gold-silver mine in Colombia recently received formal approval from Colombia's National Environmental Licensing Authority (ANLA). The company will subsequently fully implement environmental permit requirements to ensure harmonious coexistence between project operations and local communities. Based on the feasibility study completed in December 2023, the Alacran copper-gold-silver mine project is an open-pit mining and beneficiation project with an investment estimate of $420 million, total ore within the designed pit limit of 97.9 million mt, and expected cumulative recovery of 797 million pounds of copper, 550,000 ounces of gold, and 5.35 million ounces of silver. The company previously reviewed and approved an investment of approximately $231 million based on an expected 55% shareholding to construct the project. Currently, the company's equity interest in the Alacran copper-gold-silver mine has increased to 97.5%, and the company will follow the corresponding review procedures for project construction investment in accordance with the company's articles of association and make timely disclosures. Jinchengxin's Q1 2026 report disclosed on April 28 showed: The company achieved total operating revenue of 3.414 billion yuan, up 21.45% YoY; net profit attributable to the parent company was 601 million yuan, up 42.55% YoY. Regarding the reasons for the increase in Q1 operating revenue and net profit, Jinchengxin announced: This was mainly due to increased sales of mineral resource products (copper cathode, copper concentrates, iron ore) and rising copper ore product prices during the period. Jinchengxin's 2025 annual report showed: The company achieved revenue of 13.894 billion yuan in 2025, up 39.74% YoY; net profit attributable to the parent company was 2.339 billion yuan, up 47.66% YoY. Jinchengxin stated in its 2025 annual report: Operating revenue increased 39.74% YoY and net profit attributable to shareholders of the publicly listed firm increased 47.66% YoY during the period, mainly due to increased production and efficiency at captive mine projects in the mine resource development business during the reporting period. In addition, Jinchengxin stated on the interactive platform on April 28 that the company's copper ore product inventory increased at year-end 2025 and at the end of Q1 2026, mainly because the local rainy season (November–April) affected road conditions and transportation on peripheral roads of the Dikulushi copper mine in the DRC, and the produced mineral products had not yet been sold externally. China Post Securities' commentary on Jinchengxin's performance report showed: The resource segment saw volume-driven growth, while the mining services business was slightly dragged down. By business segment, the mine resource business achieved revenue/gross profit of 6.986/3.121 billion yuan in 2025, up 117.67%/130.20% YoY, while the mining services business achieved combined revenue/gross profit of 6.613/1.515 billion yuan, up 1.06%/down 13.47% YoY. The mining business saw both volume and price increases, while the decline in mining services was mainly due to the Lubambe copper mine being converted to an internal unit after acquisition, resulting in reduced recognized revenue and gross profit, and some projects being affected by declining work volumes/production ramp-up. Volume: Copper metal sales in 2025 were 92,700 mt, up 88.16% YoY; phosphate ore sales were 357,400 mt, down 1.00% YoY. The growth in copper metal production and sales was mainly due to the Lonshi copper mine reaching full production, the Dikulushi and Lonshi copper mines exceeding production plans, and the Lubambe copper mine being consolidated for the full year. In 2026Q1, copper metal production/sales were 22,400/18,100 mt, mainly affected by declining grade and the rainy season. Price: Copper prices were up 7.62% YoY in 2025 and up 36.72% YoY in 2026Q1. Production is expected to grow steadily in 2026, with significant long-term expansion potential. In 2026, the company's captive resource projects plan to produce 100,300 mt of copper metal (equivalent) and sell 99,700 mt of copper metal (equivalent), and produce and sell 300,000 mt of phosphate ore; the Yisitanxinshan magnetite project plans to produce and sell 1.25 million mt of iron ore concentrates. In the longer term, the northern mining area of the Liangchahe phosphate mine is expected to be put into use by the end of 2028, with annual capacity expanding from 300,000 mt to 800,000 mt; after the eastern zone of the Lonshi copper mine is put into production, annual production can expand from 40,000 mt to 100,000 mt; the Lubambe copper mine is undergoing technological transformation, and after completion is expected to produce 35,000 mt of copper annually; the company holds a 97.5% equity stake in the San Matias copper-gold-silver mine, which is in the EIA approval stage. Risk warnings: Price fluctuation risks; project progress falling short of expectations; downstream demand falling short of expectations; model assumptions not matching reality; policy risks exceeding expectations, etc.
May 22, 2026 19:36Recently, the Administrative Approval Bureau of Ganzhou City issued a public notice on administrative approval applications, announcing that the environmental impact assessment (EIA) for the 15,000 mt/year lithium carbonate project (re-application) of Jiangxi Xiangnan New Energy Co., Ltd. has been approved. It is reported that the project is located in the Xinhua Industrial Zone of Dayu Industrial Park, Jiangxi Province, with a total investment of 2.1 billion yuan, including 25 million yuan for environmental protection, accounting for 1.19% of the total investment. The main investments in this project include 90 million yuan for equipment, 50 million yuan for working capital, and 70 million yuan for other purposes (including environmental protection investment). The main product is 15,000 mt/year of battery-grade lithium carbonate, with a by-product of 73,483.25 mt/year of sodium sulfate decahydrate.
Jun 18, 2025 08:45The State Council Information Office held a press conference at 10 a.m. today, inviting Qin Haixiang, Vice Minister of the Ministry of Housing and Urban-Rural Development, and relevant officials from the National Development and Reform Commission (NDRC), the Ministry of Finance, the Ministry of Natural Resources, and the National Financial Regulatory Administration to introduce the "Opinions on Continuously Promoting Urban Renewal Initiatives" and answer questions from journalists. Qin Haixiang, Vice Minister of the Ministry of Housing and Urban-Rural Development: China's urban development has shifted to focusing on both improving the quality of existing stock and adjusting the structure of incremental development, entering a crucial period of urban renewal. At the State Council Information Office press conference on May 20, Qin Haixiang, Vice Minister of the Ministry of Housing and Urban-Rural Development, stated that since 2021, the government work report has made arrangements and put forward clear requirements for urban renewal initiatives every year. Currently, China's urban development has shifted from large-scale incremental construction to focusing on both improving the quality of existing stock and adjusting the structure of incremental development, entering a crucial period of urban renewal. The needs of the people have shifted from "having" to "having good quality." Qin Haixiang said that implementing urban renewal initiatives aims to promote the optimization of urban structure, improvement of functions, and enhancement of quality, driving high-quality urban development. At the same time, it can effectively boost investment and consumption, expand domestic demand, and continuously meet the people's needs for a better life. It is of great significance for promoting economic growth and further safeguarding and improving people's livelihoods. Strengthen the renovation and utilization of existing buildings, and strive to transform old and dilapidated houses into good ones. At the State Council Information Office press conference, Qin Haixiang stated that the recently released "Opinions on Continuously Promoting Urban Renewal Initiatives" is a guiding document for implementing urban renewal initiatives. In terms of task arrangements, the "Opinions" deploy the promotion of the "Four Goods" construction: "good houses, good residential communities, good neighborhoods, and good urban districts," demonstrating strong systematicness. The construction of "good houses" mainly focuses on vigorously building safe, comfortable, green, and smart houses. At the same time, it strengthens the renovation and utilization of existing buildings, striving to transform old and dilapidated houses into good ones, steadily advancing the renovation of dangerous housing, and enhancing the renovation and utilization of existing buildings such as old factories, inefficient buildings, and traditional commercial facilities. Over 940 million people in China live in urban areas. At the State Council Information Office press conference, Qin Haixiang stated that as of the end of 2024, the urbanization rate of the permanent resident population reached 67%, with 940 million people living in urban areas. The comprehensive carrying capacity of cities has steadily improved, the living environment has continued to enhance, and the quality of urban development and people's living standards have significantly increased. A total of 280,000 old residential communities have been renovated nationwide, benefiting 48 million households and over 120 million people. At the State Council Information Office press conference, Qin Haixiang stated that in recent years, the Ministry of Housing and Urban-Rural Development has guided various regions in steadily advancing the renovation of old residential communities in urban areas. By the end of 2024, a cumulative total of 280,000 old residential communities had commenced renovation nationwide, benefiting 48 million households and over 120 million people. Continue to prioritize the "hidden" projects and steadily advance the upgrading and renovation of urban underground pipeline networks Qin Haixiang stated at a press conference held by the State Council Information Office that the Ministry of Housing and Urban-Rural Development (MOHURD) will promote the detailed implementation of infrastructure renovation tasks, continue to prioritize "hidden" projects, and steadily advance the upgrading and renovation of urban underground pipeline networks for gas, water supply, sewage, drainage, and heating, as well as construct underground utility tunnels according to local conditions. The ministry will continue to enhance urban safety and resilience by implementing projects to improve urban drainage and flood prevention, advancing the safety rectification of urban gas systems, and accelerating the construction of urban lifeline safety projects. Construct and improve public service facilities for the elderly and childcare in communities according to local conditions Qin Haixiang stated at the press conference that the "Opinions on Continuously Promoting Urban Renewal Actions" identifies the renovation of old urban residential communities and the construction of complete communities as key tasks in continuously advancing urban renewal actions. Moving forward, the MOHURD will guide local authorities in effectively organizing and implementing these tasks. On one hand, building on the completion of the "14th Five-Year Plan" target for renovating old urban residential communities, the ministry will continue to advance this work, with a focus on renovating aging pipelines within communities to eliminate safety hazards. It will carry out repairs to public areas such as building rooftops, exterior walls, and staircases, as well as renovate and construct community environments and supporting facilities, and implement energy-saving renovations for buildings within communities. The ministry will also support the installation of elevators in eligible buildings to improve residents' living conditions and environments. On the other hand, the ministry will continue to promote the construction of complete communities, constructing and improving public service facilities for the elderly and childcare, as well as municipal supporting facilities such as parking and charging stations, according to local conditions, to make people's lives more convenient, comfortable, and beautiful. Accelerate the promotion of new-type urban infrastructure construction Qin Haixiang stated at the press conference that, moving forward, the MOHURD will accelerate the promotion of new-type urban infrastructure construction, utilizing information and digital technologies to enhance the intelligence level of infrastructure, expedite the improvement of long-term management systems for infrastructure operation and maintenance, explore new models for investment, financing, construction, and operation of urban development, and continuously enhance the level of urban infrastructure construction, management, and services. NDRC's Zhao Chengfeng: Central budgetary investment plan for 2025 urban renewal projects to be issued before the end of June Zhao Chengfeng, head of the Fixed Asset Investment Department of the National Development and Reform Commission (NDRC), stated at a press conference held by the State Council Information Office that the NDRC will continue to advance various urban renewal tasks and increase central investment support. This year, the central government has specifically allocated funds within the budget for urban renewal projects, supporting the construction of public infrastructure and public service facilities related to urban renewal. On the basis of supporting projects such as the renovation of old urban residential communities and urban villages, the scope of support has been expanded to include projects for the transformation and quality improvement of dilapidated urban housing, old neighborhoods, and old factory districts. Currently, the National Development and Reform Commission (NDRC) is organizing the submission of plans and project evaluations, and will issue the 2025 central budget investment plan for urban renewal projects before the end of June this year. This year, ultra-long-term special treasury bonds will continue to support the construction and renovation projects of urban underground pipeline networks. At a press conference held by the State Council Information Office, Zhao Chengfeng stated that in the funding arrangements for ultra-long-term special treasury bonds for the implementation of major national strategies and the development of security capabilities in key areas (referred to as the "two major strategies"), support will continue to be provided for the construction and renovation projects of urban underground pipeline networks. The use of local government special bonds will be optimized to continue supporting eligible urban renewal projects. The new mechanism of Public-Private Partnership (PPP) and the role of Real Estate Investment Trusts (REITs) in the infrastructure sector will be fully leveraged. The implementation of key urban renewal projects will be steadily and orderly advanced. At a press conference, Zhao Chengfeng stated that the NDRC will steadily and orderly advance the implementation of key urban renewal projects in the next step. In accordance with the principles of "overall planning with a focus on key areas," "addressing urgent needs first and implementing in stages," and "government guidance with market operations," priority will be given to implementing basic projects related to public safety and livelihood security, such as the safety enhancement of urban underground pipeline networks, the livable renovation of old residential areas, the comprehensive renovation of urban villages, and the safety renovation of municipal facilities. Improvement projects, such as the transformation and quality improvement of old neighborhoods (factory districts) and the enhancement of urban public space functions, will be steadily advanced according to local conditions. The NDRC will guide urban governments in scientifically and reasonably planning specific urban renewal projects. Guo Fangming, Director-General of the Department of Economic Construction of the Ministry of Finance: Encouraging policy banks to provide support for eligible urban renewal projects At a press conference held by the State Council Information Office, Guo Fangming, Director-General of the Department of Economic Construction of the Ministry of Finance, stated that the Ministry of Finance is focusing on the synergy between fiscal and financial policies to promote the improvement of investment and financing mechanisms, expand the investment areas for local government special bonds, and increase support for urban renewal-related projects. The leveraging role of policy-based financial instruments will be utilized to encourage policy banks to provide support for eligible urban renewal projects on the premise of risk controllability and commercial sustainability. The catastrophic insurance system for urban and rural residential housing will be improved to better provide catastrophic risk coverage, and an investment and financing model for sustainable renewal and renovation, guided by the government, operated by the market, and participated by the whole society, will be actively explored. Private enterprises will be encouraged to participate in the concession operations of infrastructure and public utilities. In 2024, central budget investment and other funds exceeding 425 billion yuan will be allocated to support local projects such as urban gas pipeline renewal and renovation. Guo Fangming stated at the press conference, "Since the 14th Five-Year Plan, central subsidy funds of approximately 159.4 billion yuan have been allocated to support the renovation of old urban communities. Since 2023, central subsidy funds of 15.3 billion yuan have been allocated to promote the renovation of urban villages. During the 14th Five-Year Plan period, central subsidy funds of about 60 billion yuan will be allocated to support 60 cities in systematically advancing sponge city construction, driving a total investment of 160 billion yuan. In 2024, central budget investment, ultra-long-term special government bonds, and additional government bonds exceeding 425 billion yuan will be allocated to support local projects such as urban gas pipeline renewal and renovation, and urban drainage and flood prevention improvement projects. While increasing capital investment, the Ministry of Finance actively implements preferential tax policies, such as the 'three exemptions and three reductions' for corporate income tax, and reductions in urban land use tax, urban infrastructure supporting fees, and education surcharges. The next step will continue to leverage these channels for sustained efforts. Zhang Bing, Chief Planner of the Ministry of Natural Resources: Actively Supports the Preparation of Special Urban Renewal Plans Zhang Bing, Chief Planner of the Ministry of Natural Resources, stated at the State Council Information Office press conference that efforts will be made to leverage the leading role of territorial spatial planning, strengthen guidance and baseline constraints for special plans, and collaboratively advance urban renewal actions. Actively support the preparation of special urban renewal plans, guide the implementation of the strategic positioning and spatial layout of the overall plan, legally and regulatively connect with detailed plans, and improve the regular inspection and five-year evaluation system. More Practical and Effective Land Use Policies Will Be Introduced to Support Urban Renewal Actions Zhang Bing stated at the State Council Information Office press conference that the Ministry of Natural Resources is currently summarizing and promoting the experiences of 43 pilot cities for inefficient land redevelopment through building communication platforms and increasing publicity efforts. Further improve the policy mechanisms for planning control, use regulation, land reserve, land supply, and real estate registration, and introduce more practical and effective land use policies to support urban renewal actions. Liao Yuanyuan from the Financial Regulatory Authority: A Special Loan Management Method for Urban Renewal Projects Will Be Studied and Introduced Liao Yuanyuan, Director of the Statistics and Risk Monitoring Department of the Financial Regulatory Authority, stated at the State Council Information Office press conference that the Financial Regulatory Authority will guide financial institutions to deeply understand the internal logic of urban renewal actions, accurately grasp new characteristics and requirements, and actively provide diverse and tailored financial products and services for urban renewal actions in accordance with the principles of legality, compliance, risk control, and commercial sustainability, meeting the financial needs of different entities, projects, stages, and links. Liao Yuanyuan stated that the National Financial Regulatory Administration will guide financial institutions to study and formulate supporting institutional processes, business systems, and performance evaluation systems in line with the specific requirements of urban renewal initiatives. It will fully leverage the unique strengths of different types of financial institutions, ensuring that financial resources are allocated effectively and achieving seamless integration with fiscal funds and social capital. The National Financial Regulatory Administration will research and introduce specialized management measures for loans for urban renewal projects, clarifying loan conditions and standards to meet the financial needs of urban renewal initiatives and enhancing the timeliness and effectiveness of financial services.
May 20, 2025 13:16The General Offices of the Central Committee of the Communist Party of China and the State Council issued the "Opinions on Continuously Promoting the Urban Renewal Initiative." The main objectives are as follows: By 2030, significant progress will be made in the implementation of the urban renewal initiative, with continuous improvement in the institutional mechanisms for urban renewal. Initial results will be achieved in the transformation of urban development and construction methods, a more solid foundation for safe development, continuously enhanced service efficiency, a significantly improved living environment, a more diversified economic landscape, effective protection of cultural heritage, more prominent urban characteristics and styles, and cities becoming spaces for the high-grade life of the people.
May 16, 2025 07:30The Intermediate People's Court of Jinzhong City, Shanxi Province (hereinafter referred to as the "Jinzhong Court") issued the Decision (2025) Jin 07 Bankr. App. (Pre) No. 1 on March 19, 2025, deciding to initiate pre-reorganization proceedings for TISCO Wanbang Furnace Charge Co., Ltd. (hereinafter referred to as the "TISCO Wanbang Company")...
Apr 28, 2025 09:17Hosted by Shanghai Metals Market (SMM), CLNB 2025 (10th) New Energy Industry Expo will be held from April 16 to 18, 2025 at Suzhou International Expo Center . During the exhibition, 1 main forum and 11 sub-forums will be held, with government leaders, academicians from the Chinese Academy of Sciences and Chinese Academy of Engineering, domestic and overseas scientists, foreign guests from dozens of countries, and leading entrepreneurs from various industries attending the event! Witness the gathering of industry leaders, discuss core technologies, listen to experts' insights, interpret market trends, gather in Suzhou, focus on key issues, and join us in dissecting industry development. This expo covers 6 major exhibition areas , with 1,300+ domestic and overseas exhibiting and participating companies showcasing the entire industry chain of batteries, including power batteries, consumer batteries, ESS, raw materials, materials, equipment, battery recycling, as well as NEVs, power tools, electric drives, and the low-altitude economy in the power exhibition area, providing you with a one-stop exhibition experience. Click to fill out the registration form and register immediately to discuss the future development of the new energy industry with industry elites. We look forward to your presence and joining SMM in opening this grand feast of the new energy industry. At this New Energy Industry Expo, Fanyin Environmental Technology (Suzhou) Co., Ltd. will make a grand appearance, collaborating with peers in the new energy industry to share development opportunities and jointly outline a bright future for new energy. Fanyin Environmental Technology (Suzhou) Co., Ltd. Booth Number: F93 cordially invites you to visit the CLNB 2025 New Energy Industry Expo About • Fanyin Environmental Fanyin Environmental Technology (Suzhou) Co., Ltd. is a manufacturing enterprise integrating R&D, production, engineering design, construction installation, and technical services of dust removal equipment and waste gas treatment equipment. Our factories are located in Kunshan, Jiangsu Province, Nantong, Jiangsu Province, and Vietnam. Our service agents are spread across multiple cities domestically and overseas. In recent years, our business has expanded to foreign countries, mainly in Vietnam, Thailand, Malaysia, Indonesia, and Australia. We are committed to providing you with excellent service! Our products will feature modular design and assembly, with advanced and complete production equipment in the workshops. Some externally purchased components are selected from high-end domestic and overseas enterprises, effectively controlling project quality, product quality, and delivery schedules. Our products are aesthetically pleasing, fully functional, stable in performance, highly automated, with low failure rates, long life, and high cost-effectiveness, enjoying a good reputation in domestic and overseas markets. Product Introduction Explosion-Proof Wet Dust Collector The explosion-proof wet dust collector is widely used in processes such as grinding, cutting, milling, wiring, drilling, and polishing where combustible and explosive dust is generated and dry explosion-proof dust collectors cannot be used. Explosion-Proof Dry Dust Collector The explosion-proof dry dust collector is designed for any process or manufacturing operation that generates or handles combustible and explosive dust or media, but it must not be used for collecting metal dust. Waste Gas Treatment Equipment Used to remove harmful substances from organic waste gases, such as benzene, toluene, xylene, and other volatile organic compounds (VOCs), widely applied in the chemical, pharmaceutical, electronics, and coating industries. Sheet Metal Processing Pipelines and Fans FRP anti-corrosion construction uses FRP resin, epoxy resin, unsaturated resin, glass fiber cloth, and auxiliary materials to evenly coat the construction surface (concrete or metal surface) for comprehensive anti-corrosion coating, meeting anti-corrosion design standards. It is widely used in industries such as pharmaceuticals, chemicals, machinery, light industry, electronics, power plants, electroplating plants, aluminum semis plants, and metallurgical plants for acid, alkali, and salt-resistant workshops, warehouses, storage tanks, walls, floors, and sewage treatment facilities. FRP Anti-Corrosion Construction Performance Characteristics: 1. Excellent heavy anti-corrosion performance, extremely resistant to acid, alkali, salt, chemical solvents, and oil corrosion; 2. Good adhesion to the substrate, strong wear resistance, impact resistance, good integrity, no cracking, and certain elasticity; dust-proof, easy to clean, and long life. 3. Improved heat deformation temperature and low-temperature impact strength; various acid-resistant, anti-corrosion, stone, and tile sheet materials and other anti-corrosion materials can be pasted on the FRP coating surface with resin mortar as per design requirements. 4. Lining on pool surfaces offers long-term water immersion resistance, low water permeability, strong adhesion, high water pressure resistance, acid and alkali corrosion resistance, anti-mildew, non-toxic, harmless, long life, simple construction, and no need for a protective layer. 【CLNB 2025——Hot Registration】 CLNB 2025 (10th) New Energy Industry Expo April 16 to 18, 2025 Suzhou International Expo Center
Apr 7, 2025 15:48