Anglo American announced that its iron ore production from the Minas-Rio project in Brazil totaled 6.36 million tons in Q1 2026, marking a 10.3% year-on-year decrease. Additionally, its metallurgical coal production plummeted 30.9% to 1.54 million tons, primarily due to operational impacts following an incident in March 2025 and severe weather disruptions at the Dawson open-cut operations.
Apr 30, 2026 13:52Lloyds Metal and Energy Limited (LMEL) reported a massive 120% year-on-year increase in iron ore production for the fiscal year ending March 2026, reaching 21.96 million tonnes. The company also recorded a 529% surge in pellet production, totaling 9.1 million tonnes, as its new processing capacities came fully online. LMEL has set an aggressive target of 26 million tonnes of iron ore production for the 2026-27 fiscal year to meet the rising demand from India's rapidly expanding domestic steel manufacturing sector.
Apr 8, 2026 16:23State-owned NMDC Limited reported a record-breaking performance for the fiscal year ending March 2026, achieving its highest-ever annual output of 53.15 million tonnes, a 21% increase year-on-year. This surge was supported by a massive 51% production spike in March alone as the company pushed to meet national infrastructure targets. Despite the record domestic volume, the mismatch between local low-grade output and the high-grade requirements of advanced steel mills continues to drive India's increasing reliance on seaborne procurement for its premium feedstock.
Apr 7, 2026 17:07Recently, Inner Mongolia Shuangli Mining Co., Ltd. (hereinafter referred to as "Shuangli Mining") held the completion and trial production ceremony for the upgrading and capacity expansion project of the mining and beneficiation system at the No. 2 Iron Mine in the Geqi mining area.Once the project reaches full production, it will produce 870,000 mt of iron ore concentrates, 9,580 mt of copper concentrates, 5,432 mt of lead concentrates, and 2,052 mt of zinc concentrates annually, injecting new momentum into Shuangli Mining's green and high-quality development.
Apr 7, 2026 14:07Kazakhstan-based steelmaker Qarmet has announced a strategic expansion of its Kentobe iron ore deposit, aiming to transition the site from an open-pit operation to a massive underground mining complex. Supported by a broader $400 million investment program, construction of the underground facility will commence in 2028 to tap into reserves exceeding 100 million metric tons. This modernization will secure long-term raw material supplies for Qarmet's metallurgical operations, lifting the site's annual iron ore output from the current 750,000 metric tons to over 850,000 metric tons in the near term.
Mar 26, 2026 13:29Australia’s iron ore output is anticipated to reach 993.4 million tonnes in 2026, a 2.6% year-on-year increase. Growth is driven by the ramp-up of the Onslow, Western Range, and Iron Bridge projects. This will be partially offset by the planned closures of the Yandi and Wonmunna mines, which together contributed 27.2 million tonnes in 2024.
Mar 17, 2026 16:04