Capacity side, according to incomplete statistics, China’s alkaline electrolyzer market remained at 43.77 GW, and the PEM electrolyzer market remained at 2.7 GW, with no new capacity added. No offline delivery information was available this week. Project-related updates: Guohua (Ningxia) New Energy Co., Ltd.: A price inquiry procurement was issued for the pre-feasibility study report preparation service for the Guohua Ningxia 100,000-mt Green Hydrogen Energy Supply Base Project (chemical section). It was understood that the Ningdong water electrolysis hydrogen production project of Guohua Ningxia had already put into operation a scale of 20,000 Nm³/h, with 6,000 Nm³/h under construction. Datang Inner Mongolia Duolun Coal Chemical Co., Ltd.: An inquiry-based procurement was launched for the feasibility study and green methanol certification consulting technical services for the CNCEC Duolun Coal Chemical coal-based process biomass co-firing coupled with green electricity green methanol production project. It was understood that the Datang Duolun 150,000-kW wind and solar power hydrogen production integrated demonstration project was China’s first medium-to-large-scale technology demonstration project for off-grid wind and solar power hydrogen production deeply coupled with coal chemical engineering. It was invested in and constructed by Datang Duolun Ruiyuan New Energy Co., Ltd., with a total investment of approximately 1.3 billion yuan. Construction officially began in November 2023, hydrogen was successfully produced on December 29, 2024, and it was formally connected to grid and put into operation on January 17, 2025. Shaanxi Construction Installation Group Co., Ltd.: The Guyang-Baiyun Obo gas transmission pipeline project, undertaken by Shaanxi Construction Installation Group, reached a major milestone, with its Guyang initial station and valve chamber having successfully passed completion acceptance. It was reported that the gas transmission pipeline project has a 20% hydrogen blending transmission capacity and is a key planned construction project under the “county-to-county coverage in western Inner Mongolia” initiative in the Inner Mongolia Autonomous Region’s 14th Five-Year Plan for oil and gas development. The pipeline has a total length of 125 km, starting from the Guyang initial station and generally running from south to north, successively passing through Guyang County, Darhan Muminggan Banner, and the Baiyun Obo mining district in Baotou City, and ultimately reaching Barun Industrial Park. Jiamusi Hanya New Energy Co., Ltd.: The Jiamusi Hanya wind power hydrogen production synthetic green methanol integrated project was filed. The project is located in Heilongjiang Province, with a total investment of 4 billion yuan. Construction scale and contents: mainly the construction of a 300,000-mt green methanol production unit and a thermal energy storage unit, with a planned land area of approximately 350,000 m². Windey Energy Technology Group Co., Ltd.: The list of winning candidates was announced for the biomass gasification process package and technical services project for the first-phase Handan Biomass Green Methanol Project. The top-ranked winning candidate was East China Engineering Science and Technology Co., Ltd. It was understood that East China Engineering has extensive experience in the gasification field, with experience in the design, construction, EPC general contracting, commissioning, and operation of more than 100 gasifiers, covering various mainstream processes such as fixed bed, fluidized bed, and entrained-flow bed. Zhongqing Xinneng (Baotou) Equipment Co., Ltd.: The annual production project for 100,000 hydrogen storage cylinders for hydrogen two-wheelers was filed. The project is located in Kundulun District, Baotou City, Inner Mongolia Autonomous Region. It plans to build a production line with an annual capacity of 100,000 hydrogen storage cylinders for hydrogen two-wheelers, including production workshop renovation and supporting utilities. Annual output value will reach 100 million yuan. The planned construction period is from April 2026 to September 2026. Shenneng North (Otog Banner) Energy Co., Ltd.: The change to the 30 MW-class pure hydrogen gas turbine hydrogen energy storage demonstration project under the Otog Banner integrated wind and solar power hydrogen production and green ammonia synthesis project was filed. After the change, the project site is located in the eastern project area of the Ordos Otog Economic Development Zone, within Shenneng's water electrolysis hydrogen production station in Ordos City, Otog Banner, bounded to the north by the green hydrogen-to-green ammonia project under the Otog Banner integrated wind and solar power hydrogen production and green ammonia synthesis project, to the east by Jingsan Street, to the west by Jinger Street, and to the south by Weisi Road. Construction scale and content: the project covers an area of 500 sq m, of which the hydrogen gas turbine occupies 300 sq m. As a hydrogen energy storage demonstration project, it includes one 30 MW pure hydrogen gas turbine, generator, hydrogen storage equipment, and supporting facilities. Through wind and solar power generation and water electrolysis for hydrogen production, the project has a total hydrogen storage capacity of 360,000 Nm³, an effective hydrogen storage volume of 270,000 Nm³, and is equipped with 12 spherical hydrogen storage tanks, each with a water capacity of 1,875 m³. Jiyuan (Siping) Green Energy Co., Ltd.: The EPC tender for the hydrogen production works of the SPIC Green Energy Lishu wind and solar power hydrogen production, biomass-coupled green methanol project was released. It is understood that the project is located in the chemical park of the Siping New-type Industrialized Economic Development Zone, Lishu County, Siping City, Jilin Province. It adopts a green hydrogen coupled with biomass gasification process to synthesize 197,200 mt/year of methanol, started construction in August 2025, and is expected to be commissioned in September 2027. The project includes three hydrogen production workshops. Workshops No. 1 and No. 2 each are arranged with 12 sets of 1,000 Nm³/h alkaline electrolytic hydrogen production electrolyzers plus three sets of 4,000 Nm³/h hydrogen purification units; Workshop No. 3 is arranged with four sets of 1,000 Nm³/h alkaline electrolytic hydrogen production electrolyzers plus one set of 4,000 Nm³/h gas-liquid separation unit, among others. Sinopec Sales Co., Ltd. Tibet Petroleum Branch : The tender notice for Section I of the general construction contracting project for the Shannan hydrogen-oxygen combined supply project was released. The construction site is in Naidong District, Shannan City, Tibet Autonomous Region; the planned construction period is 180 days; the estimated contract value for the section is 27.23 million yuan (tax included); the hydrogen production portion of the section tender includes an IGBT rectifier and control system skid, hydrogen production skid, oxygen purification unit, pure water machine and chiller unit skid, and related supporting facilities, while the hydrogen refueling portion includes a 35 MPa dual-nozzle hydrogen dispenser, 45 MPa hydrogen compressor skid, 45 MPa hydrogen storage cylinder bank, and sequence control panel. Ming Yang Smart Energy Group Co., Ltd.: It held a signing ceremony at Ming Yang Group headquarters for the hydrogen-fueled gas turbine complete-unit R&D and manufacturing project with the People's Government of Hudai Town, Binhu District, Wuxi City, Jiangsu Province, with both parties formally reaching a strategic cooperation agreement. Sichuan Zhongke Hydrogen Energy Technology Co., Ltd. : First Public Notice of Environmental Impact Assessment Information for Phase II of the Integrated Energy Station Project Featuring Hydropower, Wind and Solar Power, Hydrogen, and Natural Gas Multi-Energy Complementarity. According to the document, Phase II of the integrated energy station project featuring hydropower, wind and solar power, hydrogen, and natural gas multi-energy complementarity is located in Nanchong High-tech Zone, with Sichuan Zhongke Hydrogen Energy Technology Co., Ltd. as the project developer. It will build an integrated hydrogen production and refueling station, along with supporting public utility facilities, to realise the hydrogen refueling function of the integrated energy station for hydrogen-powered vehicles, and will also build one hydrogen energy industry R&D production site. GRINM Engineering Institute Co., Ltd. : The new materials pilot platform in Huairou Science City completed final acceptance upon completion, and four key pilot lines, including solid-state hydrogen storage and ceramic co-firing materials, entered the stage of commissioning and line integration. Among them, the total investment in the solid-state hydrogen storage project is 14.5 million yuan, and the total investment in the ceramic co-firing materials project is 12 million yuan, which will support the commercialisation of new material achievements and the industrialisation of hydrogen energy and key electronic materials. Policy Review 1. The Ministry of Industry and Information Technology, the Ministry of Finance, and the National Development and Reform Commission (NDRC) issued a notice on carrying out pilot work for the comprehensive application of hydrogen energy. The document states that by 2030, hydrogen energy in city clusters is expected to achieve large-scale application across diverse fields, and the average price of hydrogen for end-use is expected to fall below 25 yuan/kg, with efforts to reduce it to around 15 yuan/kg in certain advantaged regions; national fuel cell vehicle ownership is expected to double from the 2025 level, with efforts to reach 100,000 units. Through the expansion of application scale, it will promote innovative breakthroughs in hydrogen energy application technologies, processes, and equipment, realise iterative upgrades of fuel cells, electrolyzers, storage and transportation devices, and materials, and promote hydrogen energy as a new economic growth driver to support a comprehensive green transformation of economic and social development. 2. The People's Government of Hunan Province issued the Hunan Province 2026 Plan for National Economic and Social Development. The document states that efforts will be made to advance the circular economy and cleaner production and build a number of zero-carbon parks and zero-carbon factories. It is expected to accelerate the green and low-carbon transformation of the energy system, optimise the management of new energy project pipelines, and speed up the construction of key wind and solar power projects. It will expand green energy consumption scenarios and implement a three-year doubling plan for the service capacity of charging facilities. It will also actively develop the hydrogen energy industry and expand the scale of natural gas utilisation. 3. With the approval of the National Energy Administration, the Standardization Technical Committee for Hydrogen Energy in the Energy Industry was established in Beijing. The establishment of this committee was intended to improve the industry standards system, lead technological innovation, and regulate market order. Enterprise Developments Haida Qingneng Ship (Dalian) Co., Ltd.: The nation's first inland 64-TEU hydrogen fuel cell-powered container vessel, Dongfang Qinggang, for which it supplied the powertrain, successfully completed its first long-distance trial voyage. The entire system operated stably, the navigation performance was excellent, and the trial voyage was a complete success. Hydrogen Power (Beijing) Technology Services Co., Ltd.: 100 hydrogen-powered refrigerated trucks were officially delivered to Hydrogen Cheng Times and will be operated by Hydrogen Power Technology as the agent. Rongcheng New Energy Group: Successfully delivered 50 hydrogen-powered heavy trucks to Cangzhou Huagang International Logistics Co., Ltd. This batch of vehicles will be put into service on the transport route from Huanghua Port to the Shandong Lubei Aluminum Industry Base. CSSC Engine Co., Ltd.: Its WinGD6X72DF-A-1.0 ammonia-fueled low-speed engine successfully passed functional integration approval and bench testing, and was successfully delivered in Qingdao. It is understood that this was the first ammonia-fueled marine engine in China to be formally delivered as a commercial product. Aerospace Engineering Company: Signed contracts for two major green hydrogen engineering projects in succession, namely the hydrogen refueling station water electrolysis hydrogen production project of Zhongqing Energy Development (Shandong) Co., Ltd., and the electrolytic hydrogen production unit project for the Inner Mongolia Fenglü green hydrogen-coupled coal-to-olefins project. For these two projects, Aerospace Engineering Company will provide a total of 16 sets of HTJSDJ-1000/1.6 alkaline electrolyzers, together with supporting post-processing systems and utility engineering equipment, and will be responsible for engineering design. This cooperation marked Aerospace Engineering Company's simultaneous breakthroughs in the two major fields of green transportation and green hydrogen chemicals. Qinghang Times (Shenzhen) Technology Co., Ltd. : Qinghang Times was established on January 5, 2026, with a registered capital of 1 million yuan and legal representative He Rongjie. Founded by a Tsinghua University master's and doctoral team, it received support from Tsinghua entrepreneurship and innovation platforms including Tsinghua i-Space and Tsinghua Chuang+, and was selected for the Sci-Tech Innovation Light "Future Tech Innovators Program." With a technical solution combining liquid hydrogen storage and a high-temperature PEM hydrogen-electric coupling system, it increases aircraft driving range by more than 10 times and payload capacity by 2-3 times. Recently, it completed seed-round financing of several million yuan, with the investor undisclosed. Shenzhen Hydrogen Zhi Energy Co., Ltd.: Completed A+ round financing, with Shenzhen Energy Investment as the investor. Anhui Mashui New Energy Technology Co., Ltd. : Anhui Mashui Technology completed A-round financing of over 100 million yuan, led by NIO Capital. This round of funding will be used primarily to fulfill large orders, increase R&D reserves, support new factory construction, and cover daily operations, so as to drive the integration and upgrading of the industry chain. China Energy Engineering Corporation Research Institute: The kick-off meeting for the international standard High-Pressure Liquid Hydrogen Pump for Hydrogen Refueling Stations, led and submitted by the Low-Carbon Institute, was held online. Since the standard was approved for project initiation in November last year, this meeting clarified the advancement plan and technical roadmap, bringing together 20 experts from China, the United States, Germany, France, Russia, Japan, and the European Industrial Gases Association, who reached consensus on core issues such as the standard’s scope and application scenarios, thereby laying a solid foundation for the high-quality and timely delivery of the standard. Jiangsu Guofu Hydrogen Energy Equipment Co., Ltd. : A delegation from Thailand’s water, electricity, and related institutions came to China for exchanges on the new energy industry and made a special trip to Zhangjiagang, Jiangsu, to visit the rooftop PV hydrogen production project jointly developed by Zonergy and Guofu Hydrogen Energy. It was understood that the project relied on a distributed PV system installed on factory rooftops and used PV power generation to provide clean and stable electricity for enterprise production and energy applications, balancing efficient energy utilization with green development; at the same time, it integrated hydrogen energy application scenarios and was equipped with an ESS to ensure a stable energy supply for hydrogen production. It is a leading distributed PV hydrogen production demonstration project in China by scale, showcasing China’s advanced achievements in the integrated development of PV and hydrogen energy. Beijing SinoHytec Co., Ltd.: Signed a strategic cooperation agreement with Haitai Solar and the Hebei Hydrogen Energy Society, relying on the National Energy Administration’s first batch of hydrogen energy pilot policies and centering on the Zhangjiakou-Chengde-Tangshan hydrogen energy regional pilot to advance the deep integration of “government, industry, academia, research, and application.” The three parties will focus on the Kangbao-Caofeidian long-distance hydrogen pipeline with annual hydrogen transmission capacity of 1.55 million mt, creating a “hydrogen production in Zhangjiakou and Chengde, application in Tangshan” model. Haitai Solar will provide SinoHytec with a stable hydrogen supply and storage and transportation services, addressing the industry’s high storage and transportation costs and supporting high-quality regional hydrogen energy development and the implementation of the “dual carbon” goals. The Sixth Academy of China Aerospace Science and Technology Corporation: Released four new hydrogen energy products in Beijing, including an onboard liquid hydrogen system, liquid hydrogen refueling equipment, a liquid hydrogen tank container, and an alkaline electrolyzer, and also released a blue book on the hydrogen energy industry to help build the hydrogen energy industry ecosystem. Beijing Hydrosys Technology Co., Ltd.: Its self-developed hydraulic-driven hydrogen compressor underwent rigorous assessment and passed EU CE certification. Patent Applications 1. Shanghai Institute of Ceramics, Chinese Academy of Sciences (China) disclosed patent CN2025110028 and developed a ceramic-based anion exchange membrane, with a laboratory-tested service life of up to 80,000 hours. 2. Johnson Matthey (UK) filed patent WO2025109876, disclosing an Fe-Ni-Mo ternary non-precious metal catalyst formulation with activity close to that of platinum-based materials. Technology Footprint/Technical Specifications 1. A joint team from Xi’an Jiaotong University and Peking University jointly conducted R&D on a new-type osmium-based catalyst, significantly improving the efficiency and economics of hydrogen production via AEM water electrolysis and supporting the large-scale deployment of low-cost green hydrogen. 2. Johnson Matthey and Syensqo achieved efficient recycling and reuse of platinum group metals and ionomers in PEM fuel cells and electrolyzers, significantly reducing the carbon footprint. 3. Relevant research teams from the School of Electrical Engineering at Xi’an Jiaotong University and the State Key Laboratory of Electrical Materials and Electrical Insulation successfully developed the Ru/Ti3C2Ox@NF bifunctional electrocatalyst for seawater electrolysis. 4. The group standard Technical Specification for Hydrogen Production by Coupled Electrolysis with Wind and Solar Power, PV+ESS, and Green Electricity (No. T/CIEP 0272—2025) was released and implemented by the China Industrial Environmental Protection Promotion Association. Zhongneng Dayou Energy Technology Co., Ltd. successfully developed a 100 kW-class PEM electrolyzer hydrogen production multi-field coupling test device. 5. GKN Powder Metallurgy announced that it has developed a next-generation high performance, high-porosity, high-purity porous transport layer (HP-PTL) for proton exchange membrane (PEM) electrolysis.
Mar 20, 2026 13:42On February 24 (the first working day after the Chinese New Year holiday), the concentrated commencement activity for major projects in Q1 2026 was held in Ningxiang City, Changsha City, Hunan Province, at the site of the new-generation lithium battery R&D and comprehensive production base project of Shengxin Technology in Ningxiang Economic Development Zone. This batch involved the concentrated commencement of 30 projects with a total investment of 23.76 billion yuan, and a planned investment of 8.45 billion yuan for 2026.
Feb 24, 2026 17:50On September 26, 2025, the General Office of the Hunan Provincial People's Government issued the "Hunan Province Action Plan for Accelerating the Improvement of the New Energy Vehicle Penetration Rate (2025–2026)," focusing on the promotion and application of NEVs and industrial upgrading. It explicitly proposed accelerating the construction of energy replenishment facilities such as hydrogen refueling stations. The core contents are as follows: I. Core Action Targets The core objective is to narrow the gap with the national NEV penetration rate, advancing in phases: By the end of 2025, the gap between the provincial NEV penetration rate and the national average is expected to narrow to within 6%. By the end of 2026, the aim is to reach the national average NEV penetration rate. II. Four Key Action Tasks (1) Consumer Environment Optimization Action Innovating Sales Models : Automakers are encouraged to develop products suited to local scenarios, explore diversified sales models such as leasing instead of purchasing and battery-swapping, and expand ecological cooperation. Improving the Service Network : Promote the establishment of delivery centers and authorized after-sales service sites at the county level and in remote areas, carry out after-sales services in rural areas, and address shortcomings in grassroots services. Extending the Consumption Chain : Standardize the used car market, strengthen battery recycling and leasing management, and enhance the residual value of NEVs. Strengthening Financial Support : Increase credit supply, introduce low-down-payment, long-term financial solutions tailored to younger groups, and optimize NEV insurance services. (2) Commercial Vehicle Replacement Action Public Sector Replacement : Focus on promoting the application of NEVs in public sectors such as buses, taxis, sanitation, and freight delivery, and support key cities for air pollution prevention and control in taking the lead in replacing vehicles in urban construction logistics. Truck Transformation Incentives : Using the phase-out of trucks meeting National IV and lower emission standards as a breakthrough, implement provincial fiscal support and introduce preferential expressway toll policies for new energy trucks. (3) Energy Replenishment Facility Enhancement Action (Including Key Construction of Hydrogen Refueling Stations) Urban Residential Charging Convenience : Implement "unified construction and service" for charging piles in residential areas, provide one-stop services for car purchase, electricity connection, and pile installation, and simplify the application process. Public and Dedicated Facility Support : Improve supporting policies for land use, power grid, and electricity prices for dedicated energy replenishment facilities such as those for buses and trucks, and encourage private capital participation in construction. Energy Replenishment Network Construction at Transportation Hubs : Accelerate the planning and construction of a batch of large power charging (battery swap) stations and hydrogen refueling stations in key areas such as expressway service areas, logistics parks, ports, along major logistics corridors, and national and provincial highways. ; Promote the renovation and expansion of eligible gas (CNG/LNG) stations into comprehensive energy supply stations offering "fuel (gas) + charging (battery swap)" services. Full Coverage of Rural Energy Replenishment : Incorporate charging piles into the "Village Access Project" to achieve full coverage of charging stations in every township and charging piles in every village, promoting the integrated development of energy replenishment facilities with PV systems, parking lots, and others. (IV) Enhanced Support Policy Actions Leveraging Fiscal Funds : Coordinate special funds from the central and provincial levels to implement trade-in and car-to-countryside policies, carry out NEV sales promotions, explore charging consumption subsidies, and encourage municipalities and prefectures to issue car purchase subsidies. Traffic Priority and Parking Incentives : Encourage municipalities and prefectures to grant NEVs traffic priority on core urban routes, along with benefits such as extended operating hours and parking fee reductions in public areas. III. Safeguard Measures Establish a dual-led working mechanism by the Provincial Development and Reform Commission (Provincial Energy Bureau) and the Provincial Department of Commerce, coordinating multiple provincial departments for collaborative advancement; require local governments to refine measures and ensure implementation, while intensifying policy publicity to eliminate misconceptions and foster a social environment supportive of NEV development. This plan is expected to include hydrogen refueling stations as key components of energy replenishment facilities in transportation hubs, advancing them in coordination with charging (battery swap) stations. This will effectively address the energy replenishment challenges for NEVs (particularly hydrogen-powered vehicles), providing solid support for increasing the NEV penetration rate and transforming the energy structure in Hunan.
Oct 23, 2025 10:43[Grid Connection of 5MW/8.944MWh Energy Storage Project in Changsha, Hunan] Recently, the official account of Xiangxin Water Affairs announced that the energy storage project of Xiangjiang Happy Ocean Park, invested by its subsidiary Xiangxin Xiaohao Company, had been connected to the grid and started delivering electricity. The project is located in the core area of Xiangjiang Happy Ocean Park, Yuelu District, Changsha City, Hunan Province. It is equipped with a 5MW/8.944MWh energy storage system and adopts a two-charge and two-discharge intelligent operation strategy—storing energy during the valley period of the power grid and selling electricity back during peak electricity consumption periods in the scenic area and times of grid strain, thus establishing a highly flexible energy dispatching hub within the park.
Jul 25, 2025 15:35[SMM Shanghai and Other 1# Lead Markets: Lead Prices Fall, Downstream Buyers Adopt Wait-and-See Approach, Spot Transactions Weaken] SMM News on June 18: In the Shanghai market, Chihong and Honglu lead were quoted at 16,780-16,860 yuan/mt, with quotations at discounts of 50-0 yuan/mt against the SHFE lead 2507 contract. SHFE lead prices fluctuated and pulled back, with suppliers maintaining discounted quotations. Among them, cargoes self-picked up from primary lead smelters were quoted at discounts of 30 yuan/mt to premiums of 50 yuan/mt against the SMM 1# lead average price...
Jun 18, 2025 12:39On April 29, 2025, Jin Yu, Senior Director of SMM, Weiquan Ding, Head of Secondary Aluminum, Huanyu Li, Senior Manager of Aluminum Extrusion, Xiaoyao Zhang, Head of International Recycling, and Shihao Yang, Senior Aluminum Analyst, visited Miluo Lide Nonferrous Metals Co., Ltd. They were warmly welcomed by Chairman De Zheng and his team. Subsequently, both parties communicated and discussed the development of the secondary aluminum market and the nonferrous metals industry landscape. Through this discussion, both sides enhanced their understanding and recognition of each other, laying a solid foundation for future continuous deepening of cooperation and achieving mutual benefits. Company Profile Miluo Lide Nonferrous Metals Co., Ltd. was formerly known as Hunan Shuanghua Aluminum Industry, which was established in August 2000. The company is located in the nationally renowned Miluo Circular Economy Industrial Park in Hunan Province, with obvious geographical advantages and convenient transportation. The industrial park is well-connected by highways, with the north-south Jingzhu Expressway and the east-west Pingyi Expressway running through the area. Hunan is known as the hometown of nonferrous metals, and Miluo City (located 60 kilometers north of Changsha City, under the jurisdiction of Yueyang City) is one of the three nationally renowned recycling resource utilization bases. The Miluo Circular Economy Industrial Park is one of the first national urban mineral demonstration bases and a national circular economy pilot unit. Nonferrous metal processing is one of the pillar industries of the Miluo Circular Economy Industrial Park. The 100,000 mt annual production project of alloy aluminum ingots (aluminum liquid) of Miluo Lide Nonferrous Metals Co., Ltd. started construction in March 2017, covering an area of 64,432 m² with a building area of 36,183 m². The project includes the construction of one office building, one dormitory building, and six factory buildings, with a total investment of 200 million yuan. The first phase was put into production in May 2018, mainly producing national standard aluminum alloy ingots, with main models including Japanese ADC12, ADC10, AISi9Cu3, ADC3, AISi2; American A380, A360; EN-AC44300, EN-AC43400, etc. The second phase was put into production in August 2022, mainly focusing on aluminum liquid distribution and aluminum casting production. The raw material workshop of Miluo Lide Nonferrous Metals Co., Ltd. is equipped with a 650P horsepower fully automatic aluminum scrap crushing and sorting line (Lidi PSX-5060), with a designed capacity of 12 mt/hour. The production workshop is equipped with four sets of melting furnaces: No. 1 Melting Furnace (30 mt), No. 2 Double Chamber Furnace (80 mt), No. 3 Alloy Furnace (30 mt), and No. 4 Alloy Furnace (30 mt). It is also equipped with four automatic casting lines, two automatic stacking robots, and two rotary furnaces (5 mt and 8 mt each), with a designed capacity of 260 mt/day for aluminum alloy ingots (liquid). SMM Contact Weiquan Ding 18029344837
Jun 18, 2025 10:37