According to CMOC’s official WeChat account: On March 27, CMOC released its 2025 annual results report, which showed that the company’s operating revenue reached 206.684 billion yuan, standing firmly above the 200 billion yuan mark for the second consecutive year; net profit attributable to shareholders came in at 20.339 billion yuan, up 50.30% YoY and setting a new record for the fifth consecutive year; net operating cash flow reached the second-highest level in its history at 20.843 billion yuan; and total assets exceeded 200 billion yuan for the first time, reaching 200.932 billion yuan, up 18.03% YoY. In particular, in Q4, the company recorded operating revenue of 61.198 billion yuan, net profit attributable to shareholders of 6.059 billion yuan, and copper production of nearly 200,000 mt, all setting record highs for a single quarter. In 2025, with organisational upgrading as its main focus, the company built a “specialised, internationalised, and younger” team, refined its operations, and, together with rising prices for major products and strong production and sales, pushed its performance to a new peak. Specifically— Operating quality continued to improve. Revenue from the mining segment reached 77.713 billion yuan, accounting for 38% of total operating revenue, with the “mining” share up about 7 percentage points from 2024. Among this, revenue from copper products was 55.096 billion yuan, accounting for 27% of total operating revenue and 71% of mining-segment revenue. Both “copper” share indicators increased by about 7 percentage points YoY. This was attributable to the continued debottlenecking of two world-class copper mines, TFM and KFM, based on their existing six production lines. During the reporting period, the company’s copper production reached 741,100 mt, setting another record high and consolidating its position among the world’s top 10 copper producers. Based on the midpoint of production guidance, the completion rate was 118%, while maintaining double-digit growth of 13.99% YoY. Sales were 730,200 mt, up 5.90% YoY. Together with higher prices, copper revenue increased 31.63% YoY. Production of other products also exceeded expectations: niobium production hit a record high of 10,348 mt, with a completion rate of 103%; phosphate fertiliser production was 1.2135 million mt, with a completion rate of 106%; cobalt production was 117,500 mt, with a completion rate of 107%; molybdenum production was 13,906 mt, with a completion rate of 103%; and tungsten production was 7,114 mt, with a completion rate of 102%. In addition, the company recorded physical trading volume of 4.71 million mt, with a completion rate of 111%; IXM’s gross margin under IFRS was 2.11%, a recent high. The results of “cost reduction and efficiency improvement” became even more evident. Full-year operating costs were 157.229 billion yuan, down 11.56% YoY. In 2025, mining areas worldwide focused on key words such as innovation, technological transformation, and process optimisation, putting the concept of “refined operations” into practice. In Q4, TFM’s overall copper beneficiation and smelting recovery rate, equipment operating rate, and raw ore throughput all exceeded the calendar schedule; KFM established an ore characteristics database and ore blending model, lifting grinding efficiency by more than 30% YoY; at CMOC Brazil’s niobium segment, the recovery rates of two beneficiation plants rose by about 2 percentage points from the previous year, setting record highs; in China, recovery rates at Shangfanggou molybdenum and Sandaozhuang molybdenum and tungsten increased by 3.24 and 2.65, and 3.17 percentage points YoY, respectively, also reaching record highs. Centered on “multiple products, multiple countries, and multiple stages,” the company built a “copper + gold” dual-pole structure in 2025, adding gold resources last year. Together with the greenfield gold mine in Ecuador and four operating gold mines in Brazil, the company will have gold production capacity of 20 mt in South America by 2029. The Ecuador gold mine is expected to start production in 2029, with land acquisition and power supply assurance advancing rapidly; the Brazil gold mines achieved output above target in the first two months, and are expected to produce 6-8 mt of gold this year. Targeting copper production of 800,000-1 million mt in 2028, the company is building Phase II of the KFM project, which is expected to add annual copper capacity of 100,000 mt after coming into operation in 2027; TFM identified resource potential in relevant deposits, and preliminary preparations for Phase III construction are accelerating. In addition, the company completed the issuance of a $1.2 billion one-year zero-coupon convertible bond, broadening financing channels to support the implementation of its strategy. Alongside earnings growth, the company consistently practiced high-standard ESG principles. During the reporting period, ESG governance was further improved and digitalisation advanced; environmental performance led globally: the carbon emission intensity of its copper products was lower than that of 70% of mining companies worldwide, while the shares of renewable energy and water recycling increased further from 2024 to 38% and 89%, respectively; total global economic contribution reached 182.42 billion yuan, and global community investment was 488 million yuan. 2026 is a critical year for the company to fully implement its new development strategy and deepen platform-based operations and refined management. The company will further build a platform-based organisation: with the global supply chain centre as the pioneer, it will enhance synergies and cost competitiveness; relying on the “622” model, supplemented by multinational mine management experience and standardised business processes, it will improve its global control system. Centered on the “copper-gold dual poles,” the company will further transform its resource advantages into capacity and production advantages, while continuing to seek high-quality targets. With the goal of becoming a “globally leading, distinctive world-class mining company,” the company will continue to forge ahead in the mining industry.
Mar 28, 2026 11:05A Rio Tinto executive said the company expected the Resolution Copper mine in Arizona, US, to come online in the mid-2030s.After years of litigation, this Anglo-Australian mining giant secured control of the land required to build one of the world's largest copper mines this month.The company had now launched a $500 million drilling program to explore the previously inaccessible 30% of the deposit. This exploration would help the company determine the commissioning timetable, but the first batch of copper ore was expected to be produced within a decade.
Mar 26, 2026 10:02SMM Morning Meeting Summary: Overnight, LME copper opened at $12,016.5/mt. After dipping to $11,955.5/mt in early trading, its center rose sharply to a high of $12,160/mt, and then continued to hover at highs, finally closing at $12,092.5/mt, down 1.05%. Trading volume reached 23,000 lots, open interest stood at 293,000 lots, up 406 lots from the previous trading day, mainly reflecting increased short positions overall. Overnight, the most-traded SHFE copper 2605 contract opened at 93,600 yuan/mt and touched a low of 93,480 yuan/mt at the open. Its center then moved higher to a high of 94,990 yuan/mt, after which copper prices maintained a fluctuating trend at highs, finally closing at 94,670 yuan/mt, up 0.17%. Trading volume reached 51,000 lots, open interest stood at 198,000 lots, down 533 lots from the previous trading day, mainly reflecting reduced short positions throughout the day.
Mar 25, 2026 09:13HBIS Resources (000923) announced on March 17 that the Limpopo Province of South Africa, where its subsidiary Palabora Copper (Pty) Ltd. is located, and the neighboring Mpumalanga Province had been hit by the most severe flooding disaster since 2000. As runoff from the open pit and surrounding catchment areas surged into the company’s mine workings, some tunnels in Phase I and Phase II of the copper project were flooded, causing some critical facilities to be submerged (with no casualties). As the operating area of Copper Phase II is located at a deeper level, dewatering has progressed relatively slowly, and dewatering operations are still underway, with completion expected in early April.
Mar 17, 2026 20:51Zambia’s mining regulator said it had suspended operations at Mopani Copper Mines’ Mufulira mine after it failed to account for all its underground stuff.
Feb 14, 2026 10:40【SMM News Flash】CopperTech Metals announced a strategic partnership with Axiom Group, VBKOM, and Fleet Space Technologies on Wednesday to apply next-generation geoscientific technologies in the exploration of the Konkola copper mine.KCM (Konkola Copper Mines Plc), a subsidiary of Vedanta Resources established in 2025 under CopperTech, is responsible for the operation of the Konkola mine.The Konkola mine is considered one of the world's highest-grade copper ore assets, with proven ore grades ranging from 2.9% to 3.3% and total copper reserves/resources of approximately 16 million mt.
Feb 12, 2026 17:03