The local prices are expected to be released soon, stay tuned!
Got it
+86 021 5155-0306
Language:  

BYD was shortlisted for the tender of the 50MW/100MWh energy storage system equipment procurement for the standalone ESS power station project of China Resources in Nansha, Guangdong.

  • Apr 27, 2025, at 1:18 pm

Polaris Energy Storage Network learned that on April 25, the list of winning candidates for the procurement of the 50MW/100MWh energy storage system equipment for the China Resources Power Nansha Standalone ESS Power Station Project was announced.

The first winning candidate is BYD Auto Industry Co., Ltd., with a bid price of 52.58 million yuan, equivalent to a unit price of 0.526 yuan/Wh.

The second winning candidate is Beijing HyperStrong Technology Co., Ltd., with a bid price of 52.3409 million yuan, equivalent to a unit price of 0.523 yuan/Wh.

The bid inviter is Guangzhou China Resources Thermal Power Co., Ltd. The project is located within the premises of Guangzhou China Resources Thermal Power Co., Ltd. in Huangge Town, Nansha District, Guangzhou City, Guangdong Province. This tender is for the procurement of 50MW/100MWh energy storage system equipment.

China Resources Power Nansha Standalone ESS Power Station Project

50MW/100MWh Energy Storage System Equipment Procurement

Announcement of Winning Candidates

Announcement No.: SZBHX202504250047

The procurement of 50MW/100MWh energy storage system equipment for the China Resources Power Nansha Standalone ESS Power Station Project (Section No.: S12000825SZ0001P1) has completed the evaluation process through public tender, and the results are announced as follows:

I. Project Overview

Project Name: China Resources Power Nansha Standalone ESS Power Station Project

Section Name: 50MW/100MWh Energy Storage System Equipment Procurement

Section No.: S12000825SZ0001P1

Bid Inviter: Guangzhou China Resources Thermal Power Co., Ltd.

Tender Agency: China Resources Shouzheng Tendering Co., Ltd.

II. Evaluation Results

1. First Winning Candidate: BYD Auto Industry Co., Ltd.

1.1 Bid Price: 52,580,000.00 yuan

1.2 Quality: Meets the requirements of the tender documents

1.3 Construction Period/Delivery Date/Service Period: Meets the requirements of the tender documents

1.4 Project Leader Information: Name: -- Certificate Name: -- Certificate No.: --

1.5 Qualifications: Meets the requirements of the tender documents

1.6 Performance:

2. Second Winning Candidate: Beijing HyperStrong Technology Co., Ltd.

2.1 Bid Price: 52,340,900.00 yuan

2.2 Quality: Meets the requirements of the tender documents

2.3 Construction Period/Delivery Date/Service Period: Meets the requirements of the tender documents

2.4 Project Leader Information: Name: -- Certificate Name: -- Certificate No.: --

2.5 Qualifications: Meets the requirements of the tender documents

2.6 Performance:

3. Third Winning Candidate: /

3.1 Bid Price: /

3.2 Quality: /

3.3 Construction Period/Delivery Date/Service Period: /

3.4 Project Leader Information: /

3.5 Qualifications: /

  • Selected News
  • Solar
Live chat via WhatsApp
Help us know your opinions in 1minutes.