[SMM Announcement] Announcement on the Official Launch of Indonesia MHP Weekly Production Cost and Profit Data
Metrix
Announcements
About Us
Careers
Download App
Sign In
EN
Markets
Industry
Data Center
News and Reports
Events
Methodology
Subscribe
8μm Lithium Battery Copper Foil Premium CIF Korea
SMM-CU-CF-012
USD/tonne
Collect
Sign in to view
High
Low
Date
Aug 21, 2026
Price Details
View All
Commodity
Copper
Location
South Korea
Definition
CIF Major Ports in Korea, Premium on top of LME Cash Settlement Prices, Quotation Period M+0(M stands for arrival month)
Quality
KS C 2211-2002 Electrolytic Deposit Copper Foil for Printed Circuits
VAT Rate
-
Historical Data
1 Month
-
Sign in to view historical trend
Sign In
Date
Unit
High
Low
Avg.
Change
Date
Unit
High
Low
Avg.
Change
Average
USD/tonne
21/08/2026
USD/tonne
14/08/2026
USD/tonne
07/08/2026
USD/tonne
31/07/2026
USD/tonne
24/07/2026
USD/tonne
SMM-CU-CF-012
8μm Lithium Battery Copper Foil Premium CIF Korea
Collect
Specification
Sign in to view
Aug 21, 2026
High
Low
Historical Data
1M
3M
6M
1Y
3Y
Sign in to view historical trend
Sign In
Related News
Zimbabwe's Lithium Export Ban Looms, Only One Plant Ready as Producers Seek Deadline Extension
Aug 24, 2026 22:59
[SMM News] Lithium Argentina, Ganfeng Finalize PPG Joint Venture; Ganfeng to Invest $180 Million in Lithium Argentina
Aug 24, 2026 22:58
[SMM News Flash] PLS Group Turns Bullish on Lithium Cycle, Nears FID on Pilgangoora Capacity Doubling
Aug 24, 2026 23:00
【Lithium Battery: 3GWh NCM + LFP Cylindrical Battery Project Lands in Xinjiang】
Aug 24, 2026 19:02
Tinci's 100-Tonne Lithium Sulfide and Solid-State Electrolyte Pilot Line Enters Trial Production in Q3
Aug 24, 2026 19:10
Related News
More
Zimbabwe's Lithium Export Ban Looms, Only One Plant Ready as Producers Seek Deadline Extension
Aug 24, 2026 22:59
[SMM News] Lithium Argentina, Ganfeng Finalize PPG Joint Venture; Ganfeng to Invest $180 Million in Lithium Argentina
Aug 24, 2026 22:58
[SMM News Flash] PLS Group Turns Bullish on Lithium Cycle, Nears FID on Pilgangoora Capacity Doubling
Aug 24, 2026 23:00
【Lithium Battery: 3GWh NCM + LFP Cylindrical Battery Project Lands in Xinjiang】
Aug 24, 2026 19:02
Tinci's 100-Tonne Lithium Sulfide and Solid-State Electrolyte Pilot Line Enters Trial Production in Q3
Aug 24, 2026 19:10